Quantity Surveying Building Estimation BBS with Excel & CAD
Quantity Surveying Building Estimation BBS with Excel & CAD
Keywords : Quantity survey , quantity surveying estimation, quantity surveyor Estimation, Construction Management Construction Claims, Civil Engineering ,construction estimation, cost estimation ,construction management, procurement
OVERVIEW OF COURSE
SUB STRUCTURE QUANTITY TAKE OFF ( EXCAVATION, SAND FILLING, PCC, BACK FILLING OF FOOTING & COLUMN TILL PLINTH BEAM LEVEL )
SUPER STRUCTURE QUANTITY TAKE OFF ( PLINTH BEAM,FLOOR BEAM, FLOOR SLAB , ROOF BEAM, ROOF SLAB )
FINISHING ACTIVITIES ( PLASTERING, WALL PUTTY, PAINTING , CEILING PLASTERING, CEILING PUTTY, WALL PAPER, ELECTRICAL ETC )
ESTIMATION & COSTING OF DOG LEGGED STAIRCASE
COMPLETE ESTIMATION & COSTING OF G+2 HOSTEL BUILDING ( EXCAVATION, BACK FILLING, PCC, FOOTING, BEAM, SLAB & STAIRCASE )
BAR BENDING SCHEDULE
Bar Bending of Isolated & Combined Footing
Bar-bending Schedule Of Column Necks And Columns up to G+2 ( Manual + Excel )
Bar-bending Schedule Of Simply Supported Beam, Continuous Beam, Top Extra, Bottom Curtail & Side Face Reinforced Beams
Bar Bending Schedule Of One way Slab, two way Slab, one way Continuous Slab ( Manual + Excel + PPT)
RATE ANALYSIS FOR VARIOUS WORKS
Rate Analysis for PCC
Rate Analysis for RCC
Rate Analysis for Brickwork
Rate Analysis for Block work
Rate Analysis for wall Plastering
Rate Analysis for ceiling Plastering
Rate Analysis for Tiling
Rate Analysis for Reinforcement Works
Thumb Rules for Quick Calculations of Shuttering & Concrete Materials
Thumb rule for finding Footing Shuttering Quantity with footing Concrete Quantity.
Thumb rule for Finding Beam, Column & Slab Shuttering & Centering Quantity with Concrete Quantity.
Quick thumb rules for finding Steel for Slab, Beam, Column .
Bill Of Quantity (B.O.Q)
BOQ For Excavation & Back filling of Soil
BOQ For PCC, Concrete( M-15, M-20 ) & TMT Steel
BOQ For all Finishing Activities ( Plastering, Brickwork, Wall putty , ceiling Plastering, Painting etc )
MISCELLANEOUS LECTURES
Estimation & Costing of Under Ground Water tank of 50 Kl ( EXCEL CALCULATIONS )
Estimation & Costing of Flag pole Foundation ( Raft Foundation & RCC Pedestal Covered )
Estimation & Costing of 5 BHK House Plan with all Interiors ( Case Study )
All Explanation has Been done with Live Project Photos & videos .
Quantity Surveying, Construction Estimation ,Quantity survey ,Cost Estimation ,Civil engineering, Building Estimation
Url: View Details
What you will learn
- Quantity Survey, Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
- Able to take Entry level Jobs As a Quantity Surveyor & Estimator
- Bar Bending Schedule Of Footing, Column, Beam & Slab (Foundation To Roof Level)
Rating: 4.5163
Level: All Levels
Duration: 20.5 hours
Instructor: Akshay Kamath
Courses By: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
About US
The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of hugecourses.com.
View Sitemap