SAP CO Product Costing"STEEL Manufacturing Process"-S/4 HANA
SAP CO Product Costing"STEEL Manufacturing Process"-S/4 HANA
"SAP CO: "Product Costing: can be implemented in Steel manufacturing"
1).This course is very useful to SAP Consultants who want to implement in Steel industry sectors in the green field implementation SAP Project whether in S4 HANA and or ECC
2).This course is designed in a very structural and details step by step way like practical Live scenarios.
3). Steel manufacturing process includes Make To Stock scenario , Make To Order scenario , By & CO products , Mixed Costing process and special procurements (Stock transfer and with drawn from different plants).
Process
In Steel , Manufacturing process first we need prepare Iron Making and then Steel and then go for Finishing.
Iron making/Hot Metal:
==>Principal Input Materials : Iron Ore, Lime Stone and Coke.
==>Process : Blast Furnace
Iron is manufactured in a blast furnace. First, iron ore is mixed with coke and heated to form an iron-rich clinker called ‘sinter’. Sintering is an important part of the overall process as it reduces waste and provides an efficient raw material for Iron making.
Coke is produced from carefully selected grades of coal. Different grades of coal are stocked separately and blended before transfer to coke ovens.
Primary Steel Making:
==>Principal Input Materials : Iron/Hot Metal with Scrap Steel
==>Process : Two ways It can be done Basic oxygen furnace and Electric Arc furnace.
Here, Some customers typically required Mixed Costing Process and some one not.
Basic Oxygen Furnace
Hot metal from the blast furnace and steel scrap are the principal materials used in Basic Oxygen Steelmaking (BOS).
Electric Arc Furnace
The Electric Arc Furnace (EAF) uses DRI and scrap metal.
Mixed Costing process with Basic Oxygen Furnace (BOF) + Electric Arc Furnace (EAF) methods
Secondary Steel Making:
SLABS , BILLETS and BLOOMS forming
"Typical Costing month end closing Part"
F-02 : All FI expenses booking to common cost center
KB31N : SKF-data booked to Production cost centers
KSU1 : Assessment Cycle Creation and Assessment cost element also creation
CPTD : Actual Template Allocation for Other Overhead Expenses
KSU5 : Assessment cycle Run for allocating expenses to Production cost centers
KSS2 : Cost Splitting to activities wise
KSII : Actual activity rate Calculation
CON2 : Revaluation orders
CO8B : Co Product settlement
KKS1 : Variance calculation
CO88 : Order Settlement
Steel mfg process includes MTS, MTO, By & CO products ,Mixed Costing, Multi Special Procurements(STO & Withdrawal)
Url: View Details
What you will learn
- SAP "Product Costing" can be implemented in "Steel Manufacturing" in S/4 HANA 1909.
Rating: 4.33333
Level: Expert Level
Duration: 17.5 hours
Instructor: Karanam Sreedhar
Courses By: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
About US
The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of hugecourses.com.
View Sitemap